Field engineers fill the daily report on a tablet; the PM reviews and approves from the office. One unique number per day and project.
Daily supervision report · DSR-001 · tablet-first
The engineer fills it on site from a tablet, GPS presence, verified quantities, inspections, HSE and photos. The PM approves and the report becomes an immutable, numbered FINAL PDF distributed to investor, EPC and lender.
Who it is for
Field engineers fill the daily report on a tablet; the PM reviews and approves from the office. One unique number per day and project.
Verified progress by WBS, inspections, technical forms, NCRs and delays, documented the day they happen, with photos and GPS.
An immutable FINAL PDF for every site day, automatic distribution to investor, EPC and bank, weekly and monthly reports.
How it works
The engineer opens today's report on site. Presence time and position are recorded automatically; weather comes from the nearest station.
Workforce, equipment, verified quantities, inspections, HSE, with chips and lists, not free text. Photos carry location and time.
The PM reviews, returns for correction or approves. The FINAL version is stored with number, revision and SHA-256 and sent to the parties.
What the report contains
Every section can be enabled, renamed or made mandatory per project. Cumulative quantities, safe hours and open actions are computed automatically from previous reports.
Compliance
The site-book requirements for the works supervisor are covered by the daily report sections; the FINAL PDF of each day forms the chronological record of the project.
Date, weather and state of the work front
Section B, weather recorded automatically, terrain and programme status
Workforce and machinery present
Sections 1.1 and 1.2, by position, subcontractor and hours
Works executed and quantities
Section 1.3, accepted quantities against plan, cumulative per item
Materials received and certificates
Section 1.4, delivery notes, MIR, rejected quantities
Tests, checks and supervisor's observations
Sections 2.1–2.3 and 3.3, inspections, technical forms, NCRs, instructions
Signatures of supervisor and contractor
Section 5, prepared / reviewed / contractor acknowledgement via secure link
Full compliance with the contract and the authority's requirements remains the supervisor's responsibility; the template is configured for the specific project.
Security
FAQ
Yes. The app installs as a PWA; report changes are stored on the device and synchronised when the connection returns. The report page opens offline too.
Nobody silently. Only an administrator or the PM can reopen it with a reason; the report moves to a new revision and every action is logged with time, user and IP.
START and STOP store the time and GPS coordinates with the device accuracy. Distance from the site and leaving the perimeter are noted in the report.
Yes. Sections, mandatory fields, option lists, legal texts and numbering are configurable per organisation and per project, without code changes.
On your organisation's server, with roles (admin, PM, engineer, viewer) and per-project access. Viewers, investor, bank, only see FINAL reports.
Sign in with the account created by your organisation's administrator.